Projects

Our Projects

Discover our projects in IRM, Fabrication, CNC and Asset Management.

Download Documents

All
Inspection, Repair, Maintenance
Fabrication & Equipment Manufacturing
Precision Machining
Asset Management
  • Wellhead Adapter
  • Well Neck Flange
  • Rollers
  • Rollers
  • Manifold Block
  • Flanges
  • End Cover
  • Drilling Tool
  • Double Connection Block
  • Cuplling
  • Adapters
  • Adapter
  • Manifold Mudmat Weight: 300 tons
  • Pipe-Lay Equipment for Pyrenees Field Development
  • Material Handling Equipment for Semi-Sub Rig : BOP Carrier
  • Material Handling Equipment for Semi-Sub Rig : BOP Transporter and Crane
  • Gooseneck Handling Frame Assbly Indonesia Jangkrik Field
  • Fabrication of FLET Suction Pipe
  • Fabrication of FLET Modules (Total: 4 Sets) c/w Handling Frame
  • Fabrication of Goosenecks 8", 11.4" & 12" Total: 44 Sets
  • Wet Parking Stands Indonesia Bangka Field
  • Fabrication of 9.5 Inch Gooseneck
  • Fabrication of Pig Launcher & Receiver
  • Fabrication of Pipeline End Manifold (PLEM)
  • Fabrication of Mid Water Arch
  • Fabrication of Subsea Isolation Valve Modules
  • Fabrication of Subsea Manifold Dual-Header 6-Slot
  • Fabrication & Load-Out Living Quarters for Jack-Up Rigs Total : 6 Rig Sets @ 500 Tons Per Rig Set
  • Fabrication of New Rooms FPSO Kaombo
  • Fabrication & Load-Out of Subsea Mid-Water Arches & Gravity Bases for Indonesia Janggrik Project (Total: 2000 Tons)
  • Fabrication Subsea FLET Suction Pile
  • Fabrication & Load-Out for Bangka Project
  • Fabrication & Load-out New Zealand OMV Project
  • Fabrication & Mobilization OSV "Skandi Hercules" for Vietnam Bien Dong Phase 1 Project
  • Chain Flacking & Mobilization OSV "Skandi Hercules" for Indian ONGC D1 Mooring Chains 120mm (Total: 2400T)

    Mob/Demob & Storage

  • Fabrication & Installation OSV "Sapura 3000" for Australia Gorgon Project
  • Fabrication & Mobilization HLV "Clipper Galaxy" for Angola CLOV Project
  • Bulbous Bow Damage Repair
  • MV "Sapura Constructor" (GT: 8337, LOA: 118m) Discharging Operation

    Mob/Demob & Storage

  • HLV "Stellaprima" (GT: 6902, LOA: 100m) Discharging Operation
  • M/V "Ingrid C" (GT: 33044, LOA: 190m) Deck Crane Repair
  • M/T "Alia" (GT: 23676, LOA: 183m) Ship Repair
  • Repair & Stacking Semi-Submersible Barge "Giant 5"

    Upgrades & SPS

  • Preservation & Stacking Tender Assist "SKD T-12"

    Lay-up

  • Mobilization/Fabrication/Installation Pipelay Vessel "Star Centurion" for Ghana OCTP Development Project

    Mob/Demob & Storage

  • Stacking Jack-Up Barge "Energi 1"

    Lay-up

  • Removal of Grillages HLV "Bigroll Beaufort"

    Mob/Demob & Storage

  • Removal of Grillages HLV "Biglift Baffin"

    Mob/Demob & Storage

  • De-mobilization OSV "Skandi Singapore" for Vietnam Lamson Project

    Mob/Demob & Storage

  • Preservation, Stacking & Reactivation of a few vessels (T12, T20, Energi1 & Loch Seaforth)

    Lay-up

  • Preservation, Stacking & Reactivation Semi-Sub Tender "SKD Alliance"

    Lay-up

  • Demobilization OSV "Southern Ocean"

    Mob/Demob & Storage

  • Fabrication & Load-out HLV "Industrial Strength" for Angola Kaombo Project
  • Fabrication & Load-out HLV "BBC Vela" for Angola Kaombo Project
  • Fabrication & Loadout Helideck for Kaombo Project
  • Refurbishment & Load-Out AHTS "Logindo Braveheart" for Janggrik Project
  • Float-Out, Preservation & Stacking Semi-Tender "West Setia"

    Lay-up

  • Preservation, Stacking & Reacivation Jack-Up Rig "Rani Woro"

    Lay-up

  • 440-Pax Floatel Assembly & Installation of Cabins
  • 3000-Ton Capacity Modular Cable Carousel System Fabrication & Installation
  • Subsea Habitat for Diving Support Weight: 75 tons
  • Holdback Anchor Riser for Gumusut Kakap Field Dia. 9.6m Weight: 105 tons
  • Spreader Frames for CLOV Angola Field
  • Spreader for Tied-In Spools for Gorgon Field
  • Spuds for Dredger Length : 40m Weight : 150 tons
  • Decommissioning of Navigation, Control & Communication Buoy (Total: 450 Tons)

    Decommissioning

  • Refurbishment & Load-Out of Pipe-lay Stinger for Pipelay Vessel "Norce Endeavour"
  • Project Cargo Handling Cameron BOP

    Mob/Demob & Storage

  • Preservation & Stacking Tender Rig "SKD T-20"

    Lay-up

  • Engine Repair Bulker "Vine 2"
  • Fabrication & Mobilization MPV "Bourbon Evolution 803" for Terengganu, Malaysia
  • Pedestal Crane Repair Bulker "Tenora" (GT: 13409, LOA: 164m)
  • Stacking, Upgrading & Mobilization Semi-Sub Rig "Songa Eclipse"

    Upgrades & SPS

  • Stacking, Upgrading & Mobilization Semi-Sub Rig "Island Innovator"

    Upgrades & SPS

  • Float-Out, Preservation, Stacking & Reactivation Semi-Tender "SKD Esperanza"

    Lay-up

  • Preservation & Stacking Semi-Tender "SKD Menang"

    Lay-up

  • Float-Out, Preservation, Stacking & Reactivation Semi-Tender "SKD Berani"

    Lay-up

  • STACKING, UPGRADING & MOBILIZATION JACK-UP RIGS "COSL BOSS" & "COSL SEEKER"

    Upgrades & SPS