Milestones

Year Milestone
1997
Singatac Engineering Pte Ltd was incorporated with a humble size of 20 people, which primarily did sub-contract work for steel repairs in shipyards.
2005
Acquired a 10,000 square metres work site in Singapore.
2006
Obtained first contract in offshore structures.
2007
Obtained numerous contracts for offshore construction clients and shipyards. Operated with 600 men in a 150,000 square metres production facility. Expanded regionally into Kijang, Bintan (Indonesia).
2008
Operated inside Bintan Industrial Estate (BIE).
2009
Acquired a 70,000 square metres seafront fabrication yard in Bintan Industrial Estate (BIE) known as Singatac Offshore Centre (SOC).
2011
Singatac Offshore Centre contracted its first semi-submersible rig named ”Songa Eclipse” and its first offshore construction vessel named ”Skandi Hercules”.
2012
Singatac Offshore Centre constructed its deepwater wharf. Contracted the second semi-submersible rig named ”Island Innovator”.
2014
Singatac Offshore centre has been awarded the contract for the fabrication and supply of massive installation aids and heavy steel structures for Gorgon Chevron (Australia).
2015
Singatac Offshore centre has been awarded the contract for the provision of subsea permanent structures such as PipeLine End Manifold (PLEM), Goosenecks for Subsea Manifold, Flowline End Termination (FLET), Topside Module Cladded piping, pig launchers and receivers, etc for Bangka Chevron and Jangkrik ENI, from detailed engineering, procurement, construction, FAT/SIT, hydrotesting, testing/gauging, cleaning/drying, preservation and painting.